<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:circular="https://rhnvrm.github.io/stock-market-circulars/ns"><channel><title>Sftp - Stock Market Circulars</title><link>https://rhnvrm.github.io/stock-market-circulars/tags/sftp/</link><description>Regulatory circulars from NSE, BSE, and SEBI with AI-powered summaries</description><generator>Hugo -- gohugo.io</generator><language>en-us</language><lastBuildDate>Mon, 13 Apr 2026 00:00:00 +0000</lastBuildDate><atom:link href="https://rhnvrm.github.io/stock-market-circulars/tags/sftp/feed.xml" rel="self" type="application/rss+xml"/><item><title>SFTP Access from DR Site during Mock Session - April 18, 2026</title><link>https://rhnvrm.github.io/stock-market-circulars/circulars/bse/2026/bse-2026-04-13-bd84f99189a1d58f-sftp-access-from-dr-site-during-mock-session/</link><pubDate>Mon, 13 Apr 2026 12:44:12 +0000</pubDate><guid>https://rhnvrm.github.io/stock-market-circulars/circulars/bse/2026/bse-2026-04-13-bd84f99189a1d58f-sftp-access-from-dr-site-during-mock-session/</guid><description>BSE Index Services Pvt. Ltd. (BISPL) will operate its SFTP server from the Disaster Recovery (DR) site on Saturday, April 18, 2026, between 10:00 AM and 2:00 PM to test BCP preparedness.</description><circular:source>bse</circular:source><circular:category>market-operations</circular:category><circular:impact>low</circular:impact><circular:severity>low</circular:severity><circular:importance>low</circular:importance><circular:id>bd84f99189a1d58f</circular:id><circular:pdfUrl>https://www.bseindia.com/downloads/UploadDocs/Notices/20260413-25/20260413-25.pdf</circular:pdfUrl><category>sftp</category><category>disaster-recovery</category><category>bcp</category><category>mock-session</category><category>bse-index-services</category><category>bispl</category><category>index</category><category>equity</category><category>eod-files</category><content:encoded><![CDATA[<h2 id="summary">Summary</h2>
<p>BSE Index Services Pvt. Ltd. (BISPL) will switch its SFTP server to the Disaster Recovery (DR) site on Saturday, April 18, 2026, from 10:00 AM to 2:00 PM IST as part of its Business Continuity Planning (BCP) preparedness drill. All BISPL clients who access end-of-day (EOD) downloadable files via SFTP are requested to connect to the DR SFTP server during this window.</p>
<h2 id="key-points">Key Points</h2>
<ul>
<li>BISPL SFTP service will run from the DR site on April 18, 2026 (Saturday), 10:00 AM – 2:00 PM IST</li>
<li>DR SFTP Server IP: <strong>103.47.198.38</strong>, External Port: <strong>TCP 3313</strong></li>
<li>April 18, 2026 is a non-trading day; no new EOD files will be generated</li>
<li>EOD files available on the DR SFTP server will be from the previous trading day, April 17, 2026</li>
<li>Clients are urged to proactively participate in the DR test to verify connectivity and file download capability</li>
<li>For issues, contact BSE Helpdesk at 022-2272-8500 or BISPL Team at 022-2272-5872 / 022-2272-8131, or email <a href="mailto:bseindex@bseindia.com">bseindex@bseindia.com</a></li>
</ul>
<h2 id="regulatory-changes">Regulatory Changes</h2>
<p>No regulatory changes are introduced by this notice. This is an operational drill mandated by BCP/DR readiness requirements.</p>
<h2 id="compliance-requirements">Compliance Requirements</h2>
<ul>
<li>BISPL SFTP clients must attempt to connect to the DR SFTP server (IP: 103.47.198.38, Port: TCP 3313) during the scheduled window on April 18, 2026</li>
<li>Clients should verify they can successfully download files from the DR site</li>
<li>Any connectivity issues must be reported to the BSE Helpdesk or BISPL Team during the mock session</li>
</ul>
<h2 id="important-dates">Important Dates</h2>
<ul>
<li><strong>April 18, 2026 (Saturday)</strong>: DR Mock Session — 10:00 AM to 2:00 PM IST</li>
<li><strong>April 17, 2026</strong>: Reference date for EOD files available on the DR SFTP server during the drill</li>
</ul>
<h2 id="impact-assessment">Impact Assessment</h2>
<p>Impact is minimal and limited to BISPL SFTP clients (index data consumers). Since the drill falls on a non-trading Saturday, there is no disruption to live market operations or trading activity. The exercise is a standard infrastructure resilience test. Clients who do not participate may face unpreparedness in an actual DR scenario but face no immediate operational consequences from non-participation on this date.</p>
]]></content:encoded></item></channel></rss>