<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:circular="https://rhnvrm.github.io/stock-market-circulars/ns"><channel><title>KRMAYURVED - Stock Market Circulars</title><link>https://rhnvrm.github.io/stock-market-circulars/tags/krmayurved/</link><description>Regulatory circulars from NSE, BSE, and SEBI with AI-powered summaries</description><generator>Hugo -- gohugo.io</generator><language>en-us</language><lastBuildDate>Wed, 06 May 2026 00:00:00 +0000</lastBuildDate><atom:link href="https://rhnvrm.github.io/stock-market-circulars/tags/krmayurved/feed.xml" rel="self" type="application/rss+xml"/><item><title>NSE Enhanced Surveillance Measure (ESM) - New Inclusions and Stage Changes w.e.f. May 07-08, 2026</title><link>https://rhnvrm.github.io/stock-market-circulars/circulars/nse/2026/nse-2026-05-06-16e32568ee3fcc31-applicability-of-enhanced-surveillance-measure-esm/</link><pubDate>Wed, 06 May 2026 00:00:00 +0530</pubDate><guid>https://rhnvrm.github.io/stock-market-circulars/circulars/nse/2026/nse-2026-05-06-16e32568ee3fcc31-applicability-of-enhanced-surveillance-measure-esm/</guid><description>NSE adds 8 securities to ESM Stage I and moves 1 security (INSPIRE) from Stage I to Stage II, effective May 07-08, 2026. Affected securities will attract 100% margin and shift to Trade-for-Trade settlement.</description><circular:source>nse</circular:source><circular:category>trading</circular:category><circular:impact>high</circular:impact><circular:severity>high</circular:severity><circular:importance>high</circular:importance><circular:id>16e32568ee3fcc31</circular:id><circular:pdfUrl>https://nsearchives.nseindia.com/content/circulars/SURV74080.zip</circular:pdfUrl><circular:stock>ANLON</circular:stock><circular:stock>AVATAR</circular:stock><circular:stock>DHRUV</circular:stock><circular:stock>KRITI</circular:stock><circular:stock>KRMAYURVED</circular:stock><circular:stock>MAWANASUG</circular:stock><circular:stock>OMAXAUTO</circular:stock><circular:stock>ROLLT</circular:stock><circular:stock>INSPIRE</circular:stock><category>esm</category><category>enhanced-surveillance-measure</category><category>surveillance</category><category>trade-for-trade</category><category>margin</category><category>ANLON</category><category>AVATAR</category><category>DHRUV</category><category>KRITI</category><category>KRMAYURVED</category><category>MAWANASUG</category><category>OMAXAUTO</category><category>ROLLT</category><category>INSPIRE</category><content:encoded><![CDATA[<h2 id="summary">Summary</h2>
<p>NSE has issued Circular 330/2026 (Ref: NSE/SURV/74080) dated May 06, 2026, announcing updates to the Enhanced Surveillance Measure (ESM) framework. Eight securities are newly added to ESM Stage I, one security (INSPIRE) is elevated from Stage I to Stage II, and no securities are being removed from the framework.</p>
<h2 id="key-points">Key Points</h2>
<ul>
<li>8 securities newly included in ESM Stage I, attracting minimum 100% margin w.e.f. May 08, 2026 on all open and new positions</li>
<li>All 8 new Stage I securities will shift from Rolling Settlement (EQ/SM series) to Trade-for-Trade segment (BE/ST series) w.e.f. May 08, 2026</li>
<li>INSPIRE (Inspire Films Limited, INE0NDX01019) moves from ESM Stage I to Stage II w.e.f. May 07, 2026, with a 2% price band under Periodic Call Auction</li>
<li>No securities are being moved from Stage II to Stage I</li>
<li>No securities are being excluded from the ESM framework</li>
<li>ESM operates in conjunction with all other prevailing surveillance measures</li>
</ul>
<h2 id="regulatory-changes">Regulatory Changes</h2>
<p>This circular updates the ESM framework as originally established under circulars NSE/SURV/56948, NSE/SURV/57609, NSE/SURV/63361, NSE/SURV/64066, NSE/SURV/64400, and NSE/SURV/69315 (dated June 2023 through July 2025). Securities satisfying ESM criteria are placed under heightened surveillance with trading restrictions to protect market integrity.</p>
<p><strong>Newly Added to ESM Stage I (w.e.f. May 07, 2026; T2T from May 08, 2026):</strong></p>
<table>
  <thead>
      <tr>
          <th>Sr. No.</th>
          <th>Symbol</th>
          <th>Security Name</th>
          <th>ISIN</th>
      </tr>
  </thead>
  <tbody>
      <tr>
          <td>1</td>
          <td>ANLON</td>
          <td>Anlon Technology Solutions Limited</td>
          <td>INE0LR101013</td>
      </tr>
      <tr>
          <td>2</td>
          <td>AVATAR</td>
          <td>AVATAR Industries Limited</td>
          <td>INE617I01024</td>
      </tr>
      <tr>
          <td>3</td>
          <td>DHRUV</td>
          <td>Dhruv Consultancy Services Limited</td>
          <td>INE506Z01015</td>
      </tr>
      <tr>
          <td>4</td>
          <td>KRITI</td>
          <td>Kriti Industries (India) Limited</td>
          <td>INE479D01038</td>
      </tr>
      <tr>
          <td>5</td>
          <td>KRMAYURVED</td>
          <td>KRM Ayurveda Limited</td>
          <td>INE1MTV01019</td>
      </tr>
      <tr>
          <td>6</td>
          <td>MAWANASUG</td>
          <td>Mawana Sugars Limited</td>
          <td>INE636A01039</td>
      </tr>
      <tr>
          <td>7</td>
          <td>OMAXAUTO</td>
          <td>Omax Autos Limited</td>
          <td>INE090B01011</td>
      </tr>
      <tr>
          <td>8</td>
          <td>ROLLT</td>
          <td>Rollatainers Limited</td>
          <td>INE927A01040</td>
      </tr>
  </tbody>
</table>
<p><strong>Stage I to Stage II (w.e.f. May 07, 2026):</strong></p>
<table>
  <thead>
      <tr>
          <th>Sr. No.</th>
          <th>Symbol</th>
          <th>Security Name</th>
          <th>ISIN</th>
      </tr>
  </thead>
  <tbody>
      <tr>
          <td>1</td>
          <td>INSPIRE</td>
          <td>Inspire Films Limited</td>
          <td>INE0NDX01019</td>
      </tr>
  </tbody>
</table>
<p><strong>Stage II to Stage I:</strong> Nil</p>
<p><strong>Excluded from ESM Framework:</strong> Nil</p>
<h2 id="compliance-requirements">Compliance Requirements</h2>
<ul>
<li><strong>Brokers/Members:</strong> Must ensure minimum 100% margin is collected on all open positions (as of May 07, 2026) and new positions (from May 08, 2026) in the 8 newly added Stage I securities</li>
<li><strong>Trading systems:</strong> Must reflect migration of affected securities from EQ/SM series to BE/ST series from May 08, 2026</li>
<li><strong>For INSPIRE (Stage II):</strong> Trades must be conducted under Trade-for-Trade with a 2% price band under Periodic Call Auction from May 07, 2026</li>
<li>Members are advised that ESM classification is a surveillance action and should not be construed as adverse action against the concerned company</li>
<li>Queries may be directed to <a href="mailto:surveillance@nse.co.in">surveillance@nse.co.in</a></li>
</ul>
<h2 id="important-dates">Important Dates</h2>
<ul>
<li><strong>May 06, 2026:</strong> Circular issued</li>
<li><strong>May 07, 2026:</strong> ESM Stage I inclusions effective; INSPIRE moves to Stage II (with 2% price band under Periodic Call Auction and Trade-for-Trade)</li>
<li><strong>May 08, 2026:</strong> 100% margin requirement effective on new positions for Stage I securities; EQ/SM to BE/ST segment migration effective for all 8 new Stage I securities</li>
</ul>
<h2 id="impact-assessment">Impact Assessment</h2>
<p><strong>High impact</strong> on traders and investors holding or intending to trade in the 9 affected securities:</p>
<ul>
<li><strong>Liquidity reduction:</strong> Mandatory Trade-for-Trade settlement eliminates netting benefits and intraday squaring off, significantly reducing trading interest and liquidity in these securities</li>
<li><strong>Capital requirement increase:</strong> 100% margin requirement on open and new positions substantially raises the cost of holding or trading these stocks, likely depressing volumes</li>
<li><strong>INSPIRE (Stage II) - most restrictive:</strong> The 2% daily price band under Periodic Call Auction is the most severe restriction, virtually freezing price discovery and making exit/entry extremely difficult</li>
<li><strong>Investor caution warranted:</strong> Inclusion is based on market surveillance criteria (e.g., price-volume anomalies, corporate governance concerns) and signals elevated risk</li>
<li><strong>No removals this cycle:</strong> The absence of any exclusions from the framework indicates no securities have met the criteria for relaxation of surveillance measures in this review</li>
</ul>
]]></content:encoded></item></channel></rss>