Connectivity (39)
| Date | Circular | Tags | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Extension of migration deadline for self-service connectivity links from Jivan Vihar POP to Sify Okhla POP in Delhi until January 31, 2026. | |||||||||||||
Extension of migration deadline for self-service connectivity links from Jivan Vihar POP to Sify Okhla POP in Delhi until January 31, 2026.
| |||||||||||||
NSE adds Sify Technologies Ltd. as a last mile connectivity service provider for Wide Area Network (WAN) with availability across all POPs … | |||||||||||||
NSE adds Sify Technologies Ltd. as a last mile connectivity service provider for Wide Area Network (WAN) with availability across all POPs under Managed and Self Service modes.
| |||||||||||||
Extension of migration deadline for self-service links from old Sify POPs (STT Kolkata and Jivan Vihar Delhi) to new POPs until January 09, … | |||||||||||||
Extension of migration deadline for self-service links from old Sify POPs (STT Kolkata and Jivan Vihar Delhi) to new POPs until January 09, 2026.
| |||||||||||||
BSE announces live trading session from Disaster Recovery (DR) site for all segments including Equity, Derivatives, SLB, Currency, … | |||||||||||||
BSE announces live trading session from Disaster Recovery (DR) site for all segments including Equity, Derivatives, SLB, Currency, Commodity, and EGR with updated connection parameters for trading members.
| |||||||||||||
BSE notification regarding live trading session operations from the Disaster Recovery (DR) site for all segments including connection … | |||||||||||||
BSE notification regarding live trading session operations from the Disaster Recovery (DR) site for all segments including connection parameters and system access details.
| |||||||||||||
BSE notification regarding live trading session operations from Disaster Recovery site with connection parameters for BOLT Plus trading … | |||||||||||||
BSE notification regarding live trading session operations from Disaster Recovery site with connection parameters for BOLT Plus trading system and web-based systems.
| |||||||||||||
BSE announces mock trading session for Commodity Derivatives segment on December 20, 2025, with disaster recovery site connection parameters … | |||||||||||||
BSE announces mock trading session for Commodity Derivatives segment on December 20, 2025, with disaster recovery site connection parameters for BOLT Plus trading system.
| |||||||||||||
BSE announces mock trading session for Electronic Gold Receipts (EGR) segment on December 20, 2025 with DR connection parameters for BOLT … | |||||||||||||
BSE announces mock trading session for Electronic Gold Receipts (EGR) segment on December 20, 2025 with DR connection parameters for BOLT Plus trading system.
| |||||||||||||
BSE announces mock trading session for Electronic Gold Receipts segment on December 20, 2025 with DR connectivity parameters for trading … | |||||||||||||
BSE announces mock trading session for Electronic Gold Receipts segment on December 20, 2025 with DR connectivity parameters for trading members.
| |||||||||||||
BSE announces mock trading session on Saturday, December 20, 2025 for the Equity Derivatives segment with DR site connectivity details for … | |||||||||||||
BSE announces mock trading session on Saturday, December 20, 2025 for the Equity Derivatives segment with DR site connectivity details for BOLT Plus trading system.
| |||||||||||||