Description
NSE will conduct a mock trading session in the Currency Derivatives Segment on March 21, 2026, with two sessions from Primary and BCP sites. No new NEAT version will be released; version 3.5.4 remains current.
Summary
NSE will conduct a mock trading session in the Currency Derivatives (CD) Segment on Saturday, March 21, 2026. The session consists of two parts: Trading Session-1 from the Primary Site and Trading Session-2 from the BCP (Business Continuity Planning) Site. No new NEAT version is being released; members should continue using NEAT version 3.5.4.
Key Points
- Mock trading date: Saturday, March 21, 2026
- Two sessions: Primary Site (11:00–14:00) and BCP Site (14:45–15:30)
- No new NEAT version release; current version is 3.5.4 (download path:
/cdsftp/cdscommon/NEATCDS354) - All outstanding orders will be purged before each session
- Trades during mock sessions carry no financial obligation (no fund pay-in or pay-out)
- Members must re-login to live environment after mock session to ensure connectivity for Monday, March 23, 2026
- NOTIS application will be accessible during the mock session
- UCC/PAN validation applies; only compliant UCC/PAN uploaded before cutoff will be allowed
Regulatory Changes
No regulatory changes. This is a routine operational mock trading exercise.
Compliance Requirements
- All CD segment members are automatically eligible; participation uses existing User IDs, IPs, and Box ID mappings
- Members using NNF (Non-NEAT Frontend) software must manually clear orders in their systems before each session
- NNF users must ensure: dealer-type User ID, conversion for NNF, and IP mapping
- Members should set appropriate branch and user limits
- Members must telnet-verify Exchange host connectivity from intended IP addresses
- Members should confirm Box ID is created with appropriate segment messages
- Refer to circulars NSE/MSD/67674 (April 24, 2025) and NSE/CD/70422 (September 25, 2025) for interactive connectivity details
- Software testing requirements per NSE/MSD/46441 and SEBI circular SEBI/HO/MRD1/DSAP/CIR/P/2020/234
Important Dates
- March 21, 2026: Mock trading session
- Session-1 (Primary Site): 11:00–14:00
- Session-2 (BCP Site): 14:45–15:30
- Trade Modification end time: 15:40
- Live Re-login window: 16:30–17:00
- March 23, 2026: Next live trading day (Monday); members must ensure connectivity via re-login on mock day
Impact Assessment
Minimal market impact. This is a standard mock/DR drill for Currency Derivatives Segment members to verify operational readiness, connectivity, and software compatibility. No financial settlements occur. Members are advised to participate fully to ensure smooth live trading on Monday, March 23, 2026.
Impact Justification
Routine mock trading session for operational readiness; no regulatory changes, no new software version, and no financial obligations arise from mock trades.